Proposed DER System

Enter the system information for the proposed DER.
Use the tooltips in the form for additional helpful descriptions or explanations.

If this application is for a new DER at a location that does not have any prior DER interconnections, select the “New” option.
If adding a solar panel or making a change to the size of the system, select the “Capacity Addition or Material Modification” option.

Select if the DER is single or multiple generation. Solar plus storage is an example of multiple generating units.

Select each DER type included with this proposed DER interconnection project, and the nameplate rating in kW AC for each DER.

Select whether or not the proposed DER is using a compliant inverter. *Note that non-compliant inverters will likely not be approved.

Also provide the Manufacturer and Model of the inverter:

Answer if the aggregate size of the DER will be more than 20 kW AC.

Will the DER be interconnected to single-phase or three-phase service?

Enter the pre-incentive cost of the DER system. This will be used for state reporting purposes only.

If this proposed DER project includes energy storage, you will need to fill out the Energy Storage Application.

If the proposed DER export capability will be limited, please explain the method of limitation.

 

Save & Continue: Energy Storage Application (if applicable)

Save & Continue: Upload Required Documentation

NOVA Power Portal Tutorials List

 

 

 

STAR Energy Services LLC